The Meat in the Middle

Contracts, subcontracts and the supply chain.

Written
October 2018
By
Antonio Adamo
Topic
Practice

I like to compare many of these contractual arrangements to a dinner, because, well, I’m Italian, and at the end of the day food comes first. So imagine you are at a nice trattoria for a beautiful pasta dinner with your wife. You, in this situation, are the client, while your waiter is the Architect (in a typical contractual agreement where the Architect acts as the prime consultant). Your Architect takes all of your orders to the Chef (the General Contractor), who with his team must “build” the meal. Since the Chef is paid more than his Sous-Chef, he doesn’t want to do all the dirty work, so he orders his Sous-Chef to make all the sauces. The Sous-Chef in this case would be the Subcontractor. This is a good example because the Sous-Chef’s responsibility is simply to execute the orders given by the Chef, which come from the Architect, which come from the client. So the Sous-Chef asks his dish boy (the supplier) to bring him the pans he needs to make the sauce. Earlier in the week, a delivery of produce arrived at the kitchen from the “Manufacturer.” So the Manufacturer and Supplier provide the Subcontractor with everything he needs to make the pasta and its sauce, while the General Contractor may sprinkle some basil on top as decoration and hand it off to the Architect for final delivery to the Client, for their enjoyment.

Now that we roughly understand the hierarchy and the responsibilities of the Subcontractor with respect to the project, I will stop talking about food and talk about the role and responsibility of the Subcontractor as per the CCA 1 and CCA 19 documents. In terms of the hierarchy of the “meat in the middle” concept, it is understood that the General Contractor is at the top of the hierarchy and can be classified as the prime builder. It is the Subcontractor who enters into agreement with the General Contractor under the Prime Contract, including Subcontract Work to be performed under the Subcontract in accordance with the Contract Documents, which fall under the responsibility of the Architect, known as the Consultant in this set of documents.

It is my understanding that the suppliers and manufacturers are hired by the Subcontractor under CCA 19, classified as an agreement between the Subcontractor and Sub-Subcontractor. The Subcontractor enters the agreement called the Subcontract, where the Subcontract work must be performed under the Sub-Subcontract agreement in accordance with the Sub-Subcontract documents, under the jurisdiction of the Consultant. However, I am not sure if this is the contract used for the agreement between the Suppliers or Manufacturers and the Subcontractor. This “Subcontract work” could be something like hardwood flooring to be milled and supplied by the Supplier or Manufacturer for the Subcontractor to install. So the reason the Subcontractor is known as the “meat in the middle” is that they perform the work given to them by the General Contractor with the materials provided to them by the Suppliers and Manufacturers.

These two subcontracts, which fall under the Canadian Construction Association (CCA), can be operated in the traditional fashion of a lump-sum contract, in accordance with the contract documents set up through CCDC 2. However, if the work would be difficult to appraise and tender as one lump sum, the project can be administered as a measurement contract, in which the scope of work is tendered and paid in phases. In this case the contract documents would be administered through CCDC 5, which would then govern the inherent Prime Contracts and Subcontracts such as CCA 1 and CCA 19. This way of operating can be described as Construction Management, which is less risky as it functions on a commission basis. It passes the risk from the shoulders of the Subcontractors onto the shoulders of the Consultant.

It is typical in all of these modes of procuring construction that the Subcontractor buys the materials from the manufacturing companies, which are then shipped by an agent. However, there is a clause in CCDC 2 that allows the Owner to purchase directly from the manufacturer. I believe the following clause from CCDC 2 is the one that allows for this:

3.2.1 The Owner reserves the right to award separate contracts in connection with other parts of the Project to other contractors and to perform work with own forces.

3.2.2 When separate contracts are awarded for other parts of the Project, or when work is performed by the Owner’s own forces, the Owner shall:

.1 provide for the co-ordination of the activities and work of other contractors and Owner’s own forces with the Work of the Contract;

.2 assume overall responsibility for compliance with the applicable health and construction safety legislation at the Place of the Work;

.3 enter into separate contracts with other contractors under conditions of contract which are compatible with the conditions of the Contract;

.4 ensure that insurance coverage is provided to the same requirements as are called for in GC 11.1 - INSURANCE and coordinate such insurance with the insurance coverage of the Contractor as it affects the Work; and

.5 take all reasonable precautions to avoid labour disputes or other disputes on the Project arising from the work of other contractors or the Owner’s own forces.

So it is my understanding that if the Owner complies with the above, they can enter into other contracts and actually perform work themselves. Such other contracts, I imagine, could include engagement with suppliers and manufacturers.

A view from the field

My cousin had been in the AEC industry for eight years at the time of writing. He graduated with a diploma in Architectural Technology and has since moved forward with various independent business ventures. He has worked at all ends of the spectrum, from installing drywall and painting to design services. Through his experience in the field he had already accumulated dozens of stories that are extremely enlightening about the cut-throat nature of this industry. I told my cousin about my impressions of the supply chain and what I wrote above, and his response added a lot to what I had gathered.

He started by telling me that every single project varies in its configuration and is constantly in motion depending on the scope of work. Essentially, the General Contractor acts as the orchestrator of the work of the Subcontractors. The General Contractor does inspect the work to judge whether or not it is in accordance with the prime contract. However, he told me that it is not always so straightforward. For example, he once ran a project as General Contractor where he had to subcontract an electrician; he was not qualified to inspect the work, so the electrician had to hire an inspector to approve that everything was done properly. This is where things can get “greasy,” as he puts it. Let’s say the client wants to save a little money and hires an electrician who isn’t certified: the work ends up not being approved, causing problems in the time frame of the project. This can put major holes in the schedule and organization of other work that needs to be done, and cause massive conflicts. He also mentioned that in his experience a project has never met the timelines given by the client. Either a problem shows up on site, or the client puts in change order after change order; you name it, there are always problems and deficiencies.

He then described a very specific example from his experience as a General Contractor. He was working on a kitchen and family room renovation of a house in the Beaches. I actually spent a week working for him on this project. He had to hire a Subcontractor to take care of the flooring, so he hired an installer who bought their materials from a supplier. This company buys the materials from a separate entity (the supplier) and sells them, along with the installation work, to the client through my cousin, the General Contractor. In this case the Subcontractor takes responsibility for the installation of the flooring, and not the General Contractor. This is because my cousin is protected under a limitation of liability: he is not liable for work that he does not perform, even if he hired the worker.

This situation in particular is where it can get “greasy” again, as he says. He gave another example as a prelude to the end of this story. He was working on his mother’s kitchen and was going to order the doors to install. He mentioned that if the materials are bought by one party and installed by someone else, the installer can claim that they are not responsible for any deficiencies that may occur. They can do this because they can claim the door was installed to the manufacturer’s specification, whereas the manufacturer can claim it wasn’t installed properly. This is different from the case where the installer buys the materials himself, because he then becomes liable. Back to the door: it was not certified by the manufacturer, so if the installer puts the door in and there are deficiencies, the owner is out of luck. In the case of a lawsuit, the installer would say it was put in to specification, the manufacturer would say that they don’t even certify their own product, and you are then out of luck.

Now back to the first story. The wood floors were installed and there were deficiencies. The client reported the deficiencies to my cousin, the General Contractor; she was required to go to him first, because if she wanted to sue him in the end and hadn’t gone to him first, he could claim that he had no chance to correct the situation and would win that case. So my cousin reported the deficiencies to the installer, and they replaced the expanding, bowing and cupping flooring free of charge (as is just). After a few months, the client reported the same deficiencies to my cousin, who reported them to the installer, who then fixed the issue for a second time. After some more time had passed, the client called my cousin reporting the deficiencies for a third time. My cousin told her to look into other issues, as the installer wouldn’t be too keen on fixing it a third time. However, he reported it to the installer, as legally he is responsible for the client’s interests and could be sued if proven not to have helped solve the problem.

The installer told my cousin to tell the client to look into problems within her own home, washing his hands of the liability. What he is doing here is very smart, my cousin says. The installer is saying: I have installed this product three times now, and you, the client, are claiming that all three times the deficiencies have been due to our own negligence. We were cordial and professional with you at the start and reinstalled twice for free. Now go out and hire the professionals needed to prove that the deficiencies are due to our negligence, and if so, we’ll see each other in court; if not, have a nice day. In reality, my cousin said, the deficiencies were probably due to the home itself. The Beaches are notorious for high humidity, which would have caused the wood to expand, and the house had foundation problems. In the end, the client didn’t have the money to go out and hire professionals to prove that the house was dry, and she probably knew herself that it was not.

The greasy part of this entire transaction was the setup between the supplier and the installer. The supplier was getting very cheap wood from a manufacturing company that was not legitimate. The mill had no legitimate record and could not be contacted during all of these problems. Because of this, it would be hard to say whether or not the wood they provided was certified. My cousin’s moral of the story: the client wanted the job done cheaply, the manufacturer was not legitimate, and the supplier bought cheap materials. If you are cheap in construction, you will pay in other ways.